Manufacturing A3 · Filler jams
Owner · Line lead | Worked example using guiding figuresAll three rates are per 10 scheduled filling hours.
Adopt for the trial format. The jam rate met the target. First-pass quality and average changeover duration held in the worked trial.
Plan · Understand the jams
Current state. Change bottle format → set the guide from a generic instruction → restart → bottles catch at the infeed.
Baseline. 12 jams and 180 lost minutes over 100 scheduled filling hours. Jams were the largest loss category, at 40% of the 450 minutes logged.
Prediction. Format-specific settings and a recorded clearance check will halve the jam rate.
Do · Pilot the changeover check
| When | Owner | Action |
|---|---|---|
| Before | Line lead | Confirm approved format settings and choose 10 comparable shifts. |
| During | Operator | Check and record guide clearance. Log jam minutes and scheduled filling hours. |
| End of pilot | Line lead and Quality | Compare jam rates, first-pass quality and changeover duration. |
Evidence. Retain stop logs, clearance records, setup sheet revisions and first-pass results.
Check · Measure effectiveness
Result. 72 jam minutes over 100 scheduled hours gives 7.2 minutes per 10 hours, down 60%.
Safeguards. Check first-pass quality and changeover duration by shift and confirm that operators followed the clearance procedure.
Act · Standardise and follow up
- At adoption · Line lead. Record the decision and scope for the trial format.
- Next shift · Line lead. Update the controlled setup sheet with the approved gap, check point and sign-off. Brief all shifts.
- After two weeks · Line lead. Review the jam rate and first-pass quality. Reopen the A3 if the rate rises above 9 or quality worsens.
Next improvement opportunity. If jams recur while clearance is in range, compare events by format and shift.