LuRea Business Solutions

Manufacturing A3 · Filler jams

Owner · Line lead | Worked example using guiding figures
Baseline18 min
Target≤9 min
Trial7.2 min

All three rates are per 10 scheduled filling hours.

Adopt for the trial format. The jam rate met the target. First-pass quality and average changeover duration held in the worked trial.

Plan · Understand the jams

Current state. Change bottle format → set the guide from a generic instruction → restart → bottles catch at the infeed.

Baseline. 12 jams and 180 lost minutes over 100 scheduled filling hours. Jams were the largest loss category, at 40% of the 450 minutes logged.

Filling station Pareto showing filler jams as the largest loss at 180 minutes.

Prediction. Format-specific settings and a recorded clearance check will halve the jam rate.

Do · Pilot the changeover check

WhenOwnerAction
BeforeLine leadConfirm approved format settings and choose 10 comparable shifts.
DuringOperatorCheck and record guide clearance. Log jam minutes and scheduled filling hours.
End of pilotLine lead and QualityCompare jam rates, first-pass quality and changeover duration.

Evidence. Retain stop logs, clearance records, setup sheet revisions and first-pass results.

Check · Measure effectiveness

Jam min per 10 scheduled filling hours · Lower is better 200 Target ≤ 9 187.2 BaselineTrial
Baseline gap: 9.0 above target. Trial result: 1.8 below target.

Result. 72 jam minutes over 100 scheduled hours gives 7.2 minutes per 10 hours, down 60%.

Safeguards. Check first-pass quality and changeover duration by shift and confirm that operators followed the clearance procedure.

Act · Standardise and follow up

  1. At adoption · Line lead. Record the decision and scope for the trial format.
  2. Next shift · Line lead. Update the controlled setup sheet with the approved gap, check point and sign-off. Brief all shifts.
  3. After two weeks · Line lead. Review the jam rate and first-pass quality. Reopen the A3 if the rate rises above 9 or quality worsens.

Next improvement opportunity. If jams recur while clearance is in range, compare events by format and shift.